OUR PROJECTS

Leave request
  • Area: 650 sqft
  • Timeline: 3 days
  • System: Moisture Vapor Barrier, Epoxy Flake (Wombat mix) 

This project in Newtown, PA, transformed a 650 sqft garage into a sleek and durable space with a high-performance epoxy flake flooring system.

  • Area: 650 sqft
  • Timeline: 10-14 days
  • System: Self-Level, Microcement

This was an exciting and very stylish project in West Chester, PA, where we installed a 505 sqft microcement floor in Concrete gray.

  • Area: 650 sqft
  • Timeline: 3 days
  • System: Moisture Vapor Barrier, Epoxy Flake (Wombat mix)

This project took place in a garage in Dumont, NJ, where we began by grinding the existing floor to ensure proper surface preparation.

  • Area: 1,200 sqft
  • Timeline: 2 days
  • System: Pour-in-Place Rubber

For this playground project, we began by installing a black underlayment layer on the first day to create a soft, impact-absorbing base.

  • Area: 450 sqft
  • Timeline: 3 days
  • System:  Moisture Vapor Barrier, Epoxy Flake (Creekbed mix)

This project took place in a garage in Newtown, PA, where the existing floor already had an epoxy flake coating.

  • Area: 1,400 sqft
  • Timeline: 2 days
  • System: Pour-in-Place Rubber

For this playground, we began by installing an underlayment layer to create a soft, impact-absorbing base.

  • Area: 400 sqft
  • Timeline: 5 days
  •  System: Concrete Broom Finish

For this project, we installed a durable concrete perimeter with a broom finish, covering an area of 400 sqft around the building.

  • Area: 1,100 sqft
  • Timeline: 8 days, September 2024
  •  System: Microcement

Microcement is an excellent choice for pool deck coatings, offering not only aesthetic appeal but also essential anti-slip properties.

  • Area: 5,000 sqft
  • Timeline: 14 days, August 2024
  • System: Microcement

    In this project, we installed a microcement coating on the 1st and 2nd floors of The Rock School for Dance Education in Philadelphia, covering 5,000 sqft.
  • Area: 1,400 sqft
  • Timeline: 5 days
  • System: Epoxy coating

In this project, we focused on transforming a commercial garage that needed significant updates.