Basement with Metallic Epoxy Flooring

Leave request
  • Area: 500 sqft
  • Timeline: 6 days
  • Systems: Vapor Barrier, Self-leveling flooring, Metallic Epoxy in gray tones

We began by cleaning the substrate in preparation for the vapor barrier application. Once the vapor barrier was in place, we leveled the floor using a self-leveling flooring system. After this, we applied a base primer.

The next step was applying the metallic epoxy, using two shades of grey, one beige, and one white to create a unique and elegant design. Finally, we sealed the surface with a non-slip topcoat to ensure safety and durability.

The entire process took 6 days, allowing ample time for the materials to settle properly.