We began by cleaning the substrate in preparation for the vapor barrier application. Once the vapor barrier was in place, we leveled the floor using a self-leveling flooring system. After this, we applied a base primer.
The next step was applying the metallic epoxy, using two shades of grey, one beige, and one white to create a unique and elegant design. Finally, we sealed the surface with a non-slip topcoat to ensure safety and durability.
The entire process took 6 days, allowing ample time for the materials to settle properly.